Skip to contentAccessibility options

Massachusetts remodeling contractor marketing with your HIC number on the van, the listing and the contract

A free plan that finds every ad, listing and truck missing your HIC registration number, then rewrites deposit, price and warranty lines before a Chapter 93A letter does.

  • Your website, Google listing, Houzz page and vans checked for the HIC registration number
  • Deposit, price and warranty wording matched to the Massachusetts contract and price rules
  • Follow-up on old design consults that respects the state's quiet hours and its own no-call list
  • An honest evaluation, with no obligation to hire us
  • You own every account, domain, profile and CRM
  • One team since 2015, nothing subcontracted
  • 4,700+ businesses served
A bright kitchen with white shaker cabinets, white hexagon wall tile, a stainless range under a hood and a white marble island in the foreground
BostonWorcesterSpringfieldCambridgePlymouth

The 60-second version

  • Your HIC registration number goes on every ad, and Massachusetts counts your website, listing sites, web ads and your vans as ads.
  • Deposits stop at one third of the price unless special-order materials cost more, and a homeowner who pulls the permit loses the state Guaranty Fund.
  • Any price you advertise has to be the total with every required fee, and a Chapter 93A demand letter gives you 30 days to make a reasonable offer.
  • Follow-up sales calls wait until 8 in the morning, end by 8 at night, skip the state's own no-call list and never play a recorded pitch.

What Massachusetts law puts on a remodeler's ads and contracts

The HIC number on every ad
Web pages, web ads, apps, listing sites and ads on a vehicle all count, under the state HIC rules
Who must register
Anyone who solicits, bids or works on an existing owner-occupied home of one to four units, says the state HIC page
Deposit ceiling
A third of the price, more only when special-order materials truly cost more (home improvement contract law)
Guaranty Fund
Pays a homeowner up to $25,000 when a registered contractor does not pay a judgment (Guaranty Fund law)
Kitchen-table sales
Three business days to cancel, a contract in the language of the pitch and no work in those days (home solicitation law)
Sales call hours
No unsolicited sales call after 8 at night or before 8 in the morning, and never a recorded sales message (state telemarketing law)
BostonWorcesterSpringfieldCambridgePlymouth

By the Beyaoshy team

The van door, the Google listing and every web ad all need the HIC number

Massachusetts treats almost everything a remodeler shows the public as an ad. Each one needs your Home Improvement Contractor registration number, so check them all once and close the gaps.

The state's HIC rules say every contract, building permit and advertisement must show the certificate of registration number. The same rules spell out what an advertisement is. They name web pages, web ads, mobile apps and listing sites. They also name ads on a vehicle.

So the number goes in more places than most firms expect:

  • Your website. Put it in the footer of every page, not only the contact page.
  • Listing sites. Your Google Business Profile, Houzz, Yelp and Thumbtack descriptions each count.
  • Paid ads. Search and social ads count as web ads, and the landing pages behind them are web pages.
  • Your vans. The rule names ads on a vehicle in so many words.

Leaving it off is not a paperwork slip. Chapter 142A lists an ad without the number as a prohibited act. Any breach of that chapter also counts as a Chapter 93A violation, which lets a homeowner sue you directly.

Working unregistered is worse. Under the penalty section, operating without a registration, or with a lapsed or suspended one, can bring a fine of up to $5,000 or up to two years in jail.

Who has to register? The state's HIC page says anyone who solicits, bids on or does contracting work on an existing owner-occupied home of one to four units. So a Worcester two-family where the owner lives counts. A six-unit building does not.

A few trades sit outside it. The HIC rules leave out work done only in interior painting, finish flooring, fencing and a handful of others, plus very small jobs. A licensed plumber or electrician working only within that license is out too. A plumber who sells a whole bathroom remodel has stepped past that line.

A Massachusetts kitchen can need two credentials, held by two different people

Structural kitchen and bath work here can call for a Construction Supervisor License as well as HIC registration. Your ads and contracts should name the right holder of each.

The state's construction supervisor page says a licensed construction supervisor or a registered design professional must oversee construction on one- and two-family homes. Opening a wall for a bigger kitchen is the kind of job that brings it in.

The HIC page uses a kitchen renovation as its example of work that may need both credentials. It adds that one person need not hold both. The firm that signs the contract with the homeowner is the one that needs the HIC registration.

That shapes the copy. A firm whose lead carpenter holds the supervisor license can say a licensed construction supervisor runs its jobs. It should not print that license number as if it were the company's registration. The company's HIC number is the one the ad rule asks for.

Builders from over the border need one more check. Massachusetts does not recognize other states' contractor licenses, as the construction supervisor page says. A New Hampshire or Rhode Island remodeler taking jobs in Lowell or Attleboro needs Massachusetts credentials before the ads go live.

A narrow cobblestone lane lined with old red brick row houses with black shutters, its sidewalk covered in yellow fall leaves

Deposits, blank spaces and who pulls the permit: the terms an ad should match

Massachusetts writes much of a home improvement contract for you. An ad that promises other terms sets up a dispute, so line the two up before spring.

A home improvement deal above $1,000 has to be in writing, under the state's home improvement contract law. Up front, you may collect a third of the price at most, unless custom or special-order materials cost more than that. The contract also carries the line "Do not sign this contract if there are any blank spaces" and the three-day cancellation notice.

The permit question belongs in your marketing. Under that same law, a homeowner who pulls their own permit gives up the state Guaranty Fund, and the contract has to say so. A "we pull every permit" line next to your HIC number answers a worry many buyers have.

The fund itself is a selling point most remodelers never mention. The Guaranty Fund law pays a homeowner up to $25,000 when a registered contractor does not pay a court judgment or arbitration award. Say it plainly on your process page, without implying the fund is your own promise.

Kitchen-table sales get three business days to cancel. The state's home solicitation law covers a household sale over $25 signed anywhere but your place of business. Sell the job in Portuguese and the paperwork has to be in Portuguese too. And no crew may start work until the three days are up.

There is an emergency exception. When the homeowner called you and the job cannot wait, they can give up the right in a dated, signed statement in their own handwriting. A burst pipe under a vanity may fit. A crew that happens to be free on Monday does not. Not legal advice; confirm with counsel.

Close the HIC gaps first, then the contract lines

Name the towns you work in and send a link to your site. The plan starts with every place your registration number is missing, then lines up deposits and prices with Massachusetts contract law.

Your free plan for Massachusetts starts with:

  • Registration number on every listing, ad and van
  • Deposit and permit lines that match the contract law
  • Prices shown as totals from the first mention
Start my Massachusetts plan

Prices, "lifetime" warranties and the 30-day demand letter under Chapter 93A

A Massachusetts homeowner who feels misled by an ad can come after you directly. So every price and warranty line deserves a second read before it runs.

Under Chapter 93A, the homeowner has to mail a written demand and wait 30 days before filing suit. Answer inside that month with a reasonable written settlement offer, and your exposure is capped at what you offered. Ignore it in bad faith, or break the law knowingly, and a court can double or triple the damages and add the homeowner's legal bills.

So give these letters an owner. Someone should watch the inbox and the mail, date each letter the day it arrives and get it to counsel well inside the 30 days.

Advertised prices have their own rule. The Attorney General's fee rule has applied since September 2, 2025. Whenever a price appears, starting with the first time, it must show the total with every required fee, and the total must be the most prominent price. A bath package that adds a disposal fee at signing fails that test. A set-price package also cannot hide its total behind a form that asks for a phone number first. The rule's text does not say how it treats a custom estimate, where no price exists yet.

Sale prices get checked too. The retail advertising rule covers services as well as goods. A "was" price is safe when, among other routes, the old price was openly offered for the 14 days before the ad. It also expects you to hold proof for a claim before you publish it.

"Lifetime" needs a definition. Chapter 93A tells Massachusetts courts to be guided by how the FTC reads deceptive practices. The FTC's warranty advertising guides say an ad that calls a warranty "lifetime" should say whose life it means. "Lifetime warranty on the shower base, for as long as you own the home" passes that test. "Lifetime warranty" alone leaves the question open.

Lead law, new owners and the five Massachusetts markets worth a page each

Massachusetts has its own lead law, and it sets deadlines that create remodeling work. Families with young children buying older homes are the clearest audience.

Under the state's lead poisoning law, when a child under six lives in a home with dangerous levels of lead in paint, plaster or other accessible surfaces, the owner must abate or contain it. A new owner gets 90 days. That puts a clock on some kitchen and bath jobs a family would otherwise put off.

The lead-safe paperwork is different here too. Massachusetts runs its own lead renovation program instead of EPA's, as the EPA program page lists. So a "lead-safe certified" line on your site should name the program your certification actually came from.

Where buyers are moving decides which landing pages to build. The Census Bureau's 2025 city estimates put Worcester at 213,862 people, up about 3.6% since 2020, while Boston slipped to 672,973. In the same Census file, Plymouth grew about 10.8% to 67,846, the fastest of the five places on this page. Cambridge reached 122,588, and Springfield sat near 154,702.

Our reading: Boston and Cambridge each deserve neighborhood pages, Worcester deserves one of its own rather than a line on a Boston page, and Plymouth deserves a page for new owners. Springfield buyers search close to home, so a Springfield page should name Pioneer Valley towns, not Boston suburbs.

The energy code worries owners more than it should. Boston, Cambridge and Worcester have adopted the Specialized energy code, and Springfield and Plymouth have not, per the state's adoption list.

The state's code FAQ says the Specialized code applies only to new construction. So a kitchen remodel in an existing Cambridge home is not held to its all-electric path, and your ads need not warn that it is.

A gray shingled cottage with black shutters and a white porch behind beds of blue hydrangeas, with a tall tree on the lawn in front

Following up on a winter design consult without breaking the Massachusetts calling law

Kitchens are planned for months, so much of the selling happens on follow-up calls. Massachusetts has its own rules for those calls, on top of the federal ones.

The state's telemarketing law keeps unsolicited sales calls out of the evening and early morning. Nothing may ring after 8 at night or before 8 in the morning, by the homeowner's clock. A recorded sales message is out at any hour.

The state keeps its own do-not-call list. It takes in every Massachusetts number on the national registry, under the Office of Consumer Affairs rule. Under that rule, a firm that cold calls files with the Office and pays its fee every year, on or before January 1.

Some calls are not "unsolicited" at all. The law's definitions leave out a call the homeowner asked for. A past client whose last job with you falls inside 24 months, and who has not opted out, is also fair to ring. So is a homeowner when nothing gets sold or paid for until you sit down together, which can cover a call that just sets up a design visit at the house. The national no-call registry and federal consent rules reach that call anyway.

Callers have a script duty too. Inside the opening minute, the caller announces that this is a sales pitch and names both the calling company and the firm it sells for, under section 5A.

The penalties are real. The penalty section allows the Attorney General to ask a court for as much as $5,000 per knowing violation. A homeowner rung unlawfully twice or more in a year by the same firm can also bring a suit of their own, for up to $5,000.

Texts are a gray area. The Massachusetts statute talks about a call or a message, and the word text never appears in it. Our working rule is to run sales texts on federal consent, as our texting and AI answering playbook explains.

Picture a bot dialing every homeowner who sat through a design consult last winter. The FCC's February 2024 ruling treats that AI voice as artificial, which puts the bot under the federal rule for prerecorded calls.

That federal calling rule requires the homeowner's prior express written consent before such a sales call goes out. An AI receptionist that answers calls homeowners make is a different job from one that dials out to sell.

Recording needs care as well. Massachusetts bars secretly recording a call without every party's consent, under its wiretap law, so tell callers at the start when a call is recorded.

Would your Massachusetts ads and contracts pass a 93A read?

Pull up your website, your Google listing and the last contract you signed. Answer for what they say today. Your answers stay on your screen.

  • Does your HIC registration number appear on your site footer, your Google listing and your vans?
  • Do your contracts hold the deposit to one third, or to the real cost of special-order materials?
  • When an ad shows a price, is it the total with every required fee?
  • Does one named person handle Chapter 93A demand letters inside the 30 days?
  • Do your follow-up sales calls end by 8 at night and skip numbers on the state no-call list?

Six fixes, in order, for a Massachusetts remodeling firm

  1. Registration number on every listing, ad and van

    We go through your site footer, Google listing, Houzz, Yelp and Thumbtack profiles, each live ad and its landing page, and the van lettering, and list every place the registration number is missing.

  2. Deposit and permit lines that match the contract law

    Offers that ask for more than a third down get rewritten around the special-order exception. Your process page says who pulls the permit and what the Guaranty Fund covers.

  3. Prices shown as totals from the first mention

    Every package price on your site and ads is checked for fees added later, and any set-price offer stops asking for a phone number before it shows the total.

  4. Warranty and sale wording you can back up

    Each lifetime claim gets a stated life, and each was-and-now price is checked against what you actually charged in the 14 days before.

  5. A 30-day routine for Chapter 93A letters

    One named person receives demand letters, dates them and sends them to counsel, so a reasonable written offer can go out inside the window.

  6. Calls to past consults kept inside the state rules

    No dialing after 8 at night, state no-call matches pulled from the list, an opening line that names your firm as the seller, and no AI-voiced sales call without written consent.

Massachusetts remodelers ask about vans, permits, deposits and old consults

Does our Google Business Profile really need our HIC number?

Yes. The state HIC rules name listing sites among the places an advertisement appears, along with web pages, web ads, apps and vehicles. Put the number in the business description, where a homeowner reads it.

Our lead carpenter holds the construction supervisor license and the owner holds the HIC registration. Is that allowed?

The state HIC page says a kitchen renovation may need both credentials and that one person need not hold both. The company that signs with the homeowner needs the HIC registration, and its number goes on the ads.

Can we ask for half down on a custom kitchen?

Only if the special-order materials really cost that much. The home improvement contract law lets you take a third of the price up front, or more only when custom or special-order materials really cost more.

A homeowner wants to pull the permit to save money. What should we tell them?

That they give up the state Guaranty Fund if they do. The contract law makes your contract say so, and the Guaranty Fund law is what pays a homeowner when a registered contractor does not pay a judgment. Many firms simply pull every permit and say so on the site.

Can we call homeowners who came in for a design consult last winter?

Often, with care. Ringing a past client whose job closed less than 24 months ago, with no opt-out on file, is not an unsolicited call under the state law's definitions, but whether a consult makes someone a customer is a question for counsel. Ring only from 8 in the morning to 8 at night, name your firm as the seller right away, and check the federal rules too.

We got a 93A demand letter. How long do we have?

Thirty days to answer with a reasonable written settlement offer, under Chapter 93A. An offer made in that window can limit what you owe if the homeowner sues. Get it to counsel the day it arrives.

Sources

27 cited

Rules and figures on this page trace to these pages. None of it is legal advice; confirm anything that affects your license or your ads with the agency or your counsel.

Send the HIC registration, the towns you serve and one signed contract

Send your HIC registration number, the Massachusetts towns where you build, your website address and, if you can, one recent contract with the names removed. We come back with the missing numbers, the contract and ad lines that do not match, and an order to fix them.

  • A free consult. A real conversation about your business, your area and what is not working yet.
  • An honest evaluation. Where you stand in search, ads and follow-up next to the businesses you lose customers to.
  • A plan you keep. What we would fix first and why. It is yours whether or not you work with us.

Form not loading? Email hello@beyaoshy.com and we will reply within one business day.