Skip to content

Kitchen and bath remodeler marketing for clients who plan for most of a year

Houzz's 2026 study puts the average kitchen at 9.5 months of planning before anyone swings a hammer, and finds homeowners far more likely to hire a generalist than a kitchen and bath specialist. The firm that wins is the one still in front of the homeowner in month eight, with the galleries, process and price ranges that make a specialist the obvious pick. We build that first, then the ads, inside the license, lead paint and lending rules this work carries.

Taking on new kitchen and bath remodelers now

Reviewed by Niomi Ascot on

Nobody wants a torn-out kitchen at Thanksgiving, and the year bends around it

The ratings show how inquiries usually run for a kitchen and bath firm, from working with the trade rather than from a survey; the reasons below are sourced. What makes this calendar unusual is the gap between the month someone first asks and the month you build. Houzz's 2026 study puts kitchen planning at 9.5 months on average, so a homeowner who starts looking in January is, at the average, not ready for demolition until the fall.

Demand through the year for kitchen and bath remodelers
  1. January: Busy
  2. February: Busy
  3. March: Peak
  4. April: Peak
  5. May: Busy
  6. June: Busy
  7. July: Steady
  8. August: Steady
  9. September: Busy
  10. October: Busy
  11. November: Slow
  12. December: Slow
January and February
New-year planning brings design consult requests for spring and summer builds. These are the leads most often dropped too early: primary baths average 8.4 months of planning in Houzz's data, so a January inquiry that goes quiet in March is usually still deciding.
March and April
The inquiry peak. Google's own estimate for Local Services Ads verification is three to four weeks once documents are in, and the Kitchen remodeling category checks both the business and its owner, so file in winter if you want the badge showing for spring.
May and June
Contracts signed for summer and the busiest showroom weeks. Every finished spring job is a gallery set and a review, and reviews older than three months count for little with 74% of consumers in BrightLocal's 2026 survey, so ask at the final walkthrough, with photos.
July and August
Vacations thin out consults, and the mid-year outlooks arrive. In July 2026 the NKBA's Kitchen and Bath Market Index sat flat at 53 out of 100 and member firms cut their 2026 revenue forecast to minus 2%. Set next year's budget against numbers like those, not against last spring.
September and October
"Done before the holidays" calls. Kitchens average 5.8 months of construction and primary baths 4.8 in Houzz's study, so a holiday deadline is honest only for small scopes signed early; say that in the ad rather than promise it. October also opens next year's design season.
November and December
Few homeowners want work under way over the holidays, and searches turn to ideas and costs for next year. Keep retargeting and a monthly email going to every open consult instead of chasing installs.

Where a kitchen or bath client starts looking, often a year ahead

Ordered by the signed work each usually produces for a firm doing kitchens and baths, biggest first. Most of these searches are research rather than buying: BrightLocal's 2026 review survey found 66% of consumers keep researching after reading a positive review, while 34% are ready to buy.

Google Search and the map pack
"Kitchen remodel cost", "bathroom remodeler near me", the town plus the room. The first search often comes months before a contract, so the site has to hold a researcher: galleries split by room, the steps of a design consult and what moves a budget up or down. After reading positive reviews, 54% of consumers next visit the company's website, per BrightLocal.
Past clients, designers and showrooms
Houzz's 2026 kitchen study found 22% of renovating homeowners hire a kitchen designer, and designers, cabinet showrooms and past clients send work that never touches an ad. Those homeowners still look you up before the first call, so the referral and the profile have to tell the same story.
Houzz and other project platforms
By Houzz's own count, its users worldwide include over 70 million homeowners and design fans and more than 3 million professionals. It is where many homeowners save rooms they like, and Houzz Pro sells lead generation to firms. Judge it the way you judge any source: by contracts signed, not inquiries.
Local Services Ads
Two categories, not one. Kitchen remodeling background-checks the business and the owner for everyone who advertises in it; Bathroom remodeling does so only for some. Both want certificates for general and professional liability insurance, and state business and owner licenses wherever those apply, and both display the Google Verified badge.
Facebook and Instagram
Before-and-after reels for the neighborhoods you work in, and retargeting through the months a homeowner spends planning. A lead-form lead in WordStream by LocaliQ's Home & Home Improvement category cost $42.95 at the median in its 2026 Facebook report, on data running from April 2025 through June 2026. Those leads need more follow-up than a search inquiry before anyone books a consult.
AI assistants and review summaries
The share of consumers turning to ChatGPT or another AI tool for a local recommendation went from 6% to 45% in a year, BrightLocal reported in 2026, and 82% read the review summaries that AI tools produce. Those answers are built from what is written about you, so reviews that name the room and the town, and pages that explain your process, do double duty.

Why a kitchen and bath plan starts with the case for a specialist

Many home service plans begin with being found. Here the homeowner will find several firms over months of planning, and in Houzz's 2026 study general contractors were hired by 29% of homeowners who renovated, kitchen and bath remodelers by 8%. So being chosen comes first.

Chosen

Being the one they pick once they have found a few.

On bath projects, Houzz's bathroom study found general contractors hired 52% of the time and bathroom remodelers 23%. Your site has to say what a specialist does that a generalist does not: the design process, cabinet and tile lead times, who is on site each day and ranges by room, with your license number and EPA RRP firm certification shown where they apply.

Clear

Knowing which work produced which jobs.

A kitchen inquiry can take most of a year to sign, long enough for everyone to forget where it came from. Every inquiry is tagged by source and by room and carried through consult, design agreement, proposal and signature, so next year's budget follows contracts rather than memory.

Found

Being the company that shows up when someone searches.

Separate pages for kitchens and baths in the towns you work, the right primary category on your Business Profile, applications in both Local Services categories and search campaigns on major-remodel terms. A major kitchen runs $55,000 at the median in Houzz's kitchen study against $20,000 for a minor one, so the keywords and the consult form aim at the bigger job.

Kept

Turning one job into the next one and the referral.

A design consult that does not sign this month is not lost. A monthly note with a finished project, a reminder before the season they said they would build, a review ask at the final walkthrough and a thank-you to the designer who sent the job keep the firm in the conversation.

Weeks 1 to 3

Galleries rebuilt from your own jobs, each set labeled with the room, the town, the scope and how long it took. License number, and RRP firm certification if you work in pre-1978 homes, added to the site and profile. A review request to every client finished in the past three months.

Weeks 3 to 6

Call and form tracking by source, and pipeline stages in the CRM: inquiry, consult booked, design agreement, proposal, signed and cancelled. One agreed definition of a qualified lead, usually room, budget range and timeline.

Weeks 6 to 10

Kitchen and bath pages for each service and town, Business Profile categories and photos, Local Services applications in the categories you want, and search campaigns on major-remodel terms. Every financing line checked against Truth in Lending before it runs.

Weeks 10 to 13

Follow-up built for a long decision: a monthly project story, consult reminders timed to the build season each homeowner named, and a budget guide. Then the first report that runs from source to signed contract.

Design-build studios, bath specialists and the firms losing bids to generalists

Most of the firms we fit best do major remodels with a small team: a designer or two, a project manager and crews they trust. Houzz's 2026 kitchen study found 98% of homeowners spending $50,000 or more on a kitchen bring in at least one professional, so at that size the question is never whether they hire, only whom.

The design-build firm with a showroom

Design consults are the product, and samples and displays close them. The work is booking the consult, staying with it for months and tracing it to a contract. Selling from a showroom changes the paperwork too: the FTC's three-day cancellation right attaches to sales made in the home, not to a deal negotiated at the seller's permanent place of business.

The bath conversion specialist

Tub-to-shower and accessibility work, a repeatable offer and short installs. Houzz puts the 2025 median at $7,000 for a guest bath and $15,000 for a primary bath, so volume, a fast reply and a clean consult booking matter more here than a nine-month nurture.

The kitchen firm that keeps finishing second

In Houzz's kitchen study, 48% of renovating homeowners brought in a general contractor and 34% a cabinetmaker. If proposals keep going to someone else, the site and the proposal need to say plainly what a specialist does differently, with proof from your own jobs.

The remodeler working in pre-1978 neighborhoods

Older housing brings the EPA's lead paint renovation rule, and without firm certification a company may not even advertise that work in a house of that age. A certified firm can say so on every page, and a homeowner with an older house can check it.

Who we would point elsewhere. Firms with no finished work to show yet. Without your own photos and reviews, ads send homeowners to an empty gallery, so the first step is documenting every job. We would also pass on sign-tonight selling at the kitchen table: the FTC gives three days to cancel a sale made in the home, California allows three business days or five when the buyer is 65 or older, and the reviews that follow pressure selling are hard to undo.

Local Services Ads, Houzz and lead sites, or your own site, for a design consult

Three places a kitchen and bath firm pays for, or earns, the first conversation. Each suits a different stage of a decision that takes months; keep whichever mix signs contracts at a price per job your margins allow.

QuestionLocal Services AdsHouzz and lead sitesYour site and Google profile
BillingEach valid call, message or booking is charged as a leadSet by each platform; Houzz Pro sells lead generation, and Angi, HomeAdvisor and Thumbtack price their ownNo media cost; the time to keep galleries, reviews and services current
ScreeningKitchen remodeling: business and owner checks on everyone. Bathroom remodeling: on some advertisers only. Both: liability insurance and state licenses where requiredWhatever each platform asks at sign-upProfile verification, plus your license number on the site and ads where your state requires it
What the homeowner seesThe Google Verified badge, your rating and your review countYour photos and reviews on that platform, which do not carry over to GoogleGalleries by room, the design process, price ranges and your Google reviews
Fit with a long decisionBuilt for a quick call; a planning homeowner may call once and go quietGood for homeowners collecting ideas; ask whether an inquiry also goes to other firmsHolds a homeowner for months and turns a researcher into a consult request
PhotosUp to 100 additional business photos once the account moves into Google AdsAs many as the platform allows, on its pagesEvery project, with the room, town, scope and timeline
Best at"Bathroom remodeler near me" and quick conversion jobsBeing seen by homeowners saving rooms they likeThe referred homeowner who looks you up before calling

The shift of Local Services Ads into Google Ads, which started in August 2026, named plumbing, HVAC and other home services for its first wave. Kitchen and bath remodeling was not among them; Google's schedule puts broader groups later in 2026 and all the categories left over in 2027. Once a kitchen or bath account moves, the manual cost-per-lead cap disappears.

What the rooms are worth, and what a contractor lead costs on Google

Houzz's medians for what homeowners spent, beside the nearest published lead benchmark. LocaliQ reports no kitchen and bath category; its Construction & Contractors (General) line, from its 2025 home services report covering April 2024 to March 2025, is the closest. Both are market figures, never our own results. Set a $165.67 median lead against a $24,000 median kitchen and the math only works when you count signed contracts rather than inquiries.

9.5 months
Average time homeowners spent planning a kitchen renovation, before 5.8 months of construction
Houzz & Home, 2026
8%
Of renovating homeowners hired a kitchen and bath remodeler in 2025, against 29% who hired a general contractor
Houzz & Home, 2026
$165.67
Construction & Contractors (General) median cost per lead on Google search, the closest LocaliQ category, April 2024 to March 2025
LocaliQ, 2025
51
Remodelers' rating of current leads and inquiries in Q2 2026, where 50 means as many report good as poor; it stood at 62 in Q4 2024
NAHB Remodeling Market Index, 2026
Median homeowner spend by project, from Houzz studies published in 2026
  • Major kitchen remodel$55,000
  • Major bathroom remodel$25,000
  • All kitchen projects, 2025$24,000
  • Minor kitchen remodel$20,000
  • All primary bathroom projects, 2025$15,000
  • All guest bathroom projects, 2025$7,000

Medians from three homeowner surveys: Houzz & Home (20,358 respondents), Kitchen Trends (1,780) and Bathroom Trends (1,619). The spread between a minor and a major kitchen is why a consult form should ask for scope and budget up front. Sources: Houzz Kitchen Trends 2026; Houzz Bathroom Trends 2026, via KBB; Houzz & Home 2026.

Our plans cost what a firm with one showroom or design studio can afford, and the scope follows how many consults you can actually run in a month. You see the first steps we would take, on paper, before you pay us anything.

Get your free plan

How a paid-for design consult goes quiet before anyone signs

A homeowner who books a design consult has usually been saving kitchen photos for months, and the firm has spent on ads, Houzz and showroom hours to get that appointment. Most of what goes wrong next is quiet. A call rings out during a job walk, a proposal waits for the homeowner to call back, a design meeting shows too many cabinet lines, and a financing email to the whole list turns into an ad.

Nobody picks up while we're on a job walk

Invoca's July 2026 home services report puts the answer rate for its construction group, the nearest match it publishes for remodelers, at 32%, the lowest of the trades it tracks (vendor data). A homeowner who has saved kitchen photos for months and finally calls is unlikely to try three times.

The fix. Give missed calls one owner and a backup, and work through the missed calls at lunch and again before the crew leaves, with every after-hours miss returned first thing next morning. Change the voicemail greeting to the firm's name and "we'll text you back from this number within a few minutes", then send exactly one text to the number that called, with no offer in it, worded with counsel's sign-off.

We sent the proposal and waited for them to call

Houzz's 2026 study has kitchens averaging 9.5 months of planning and primary baths 8.4. That clock starts at the first idea, not at your proposal, so it does not show estimates sitting unanswered. It does mean a homeowner who goes quiet in week three is usually still deciding, not gone.

The fix. Run four touches on each open proposal: the designer's text the same day with one line in the homeowner's own words, a call on day two asking whether anything is unclear, something useful on day seven such as cabinet lead times or a finished room like theirs, and on day fourteen, "Shall I keep this open, update it for later, or close it out?" If the answer is later, ask which month they expect to decide and set one reminder for it, rather than weekly calls.

We showed them six cabinet lines and they went home to think

A 2014 meta-analysis of 99 observations in the Journal of Consumer Psychology found choice overload more likely when the decision is hard, the options complex and preferences uncertain, and putting the choice off was one of its signs. Simonson's 1989 research found a middle option tends to gain share, more so when people expect to justify the choice to others, as a couple redoing a kitchen usually does. Neither study measured a remodeler's close rate.

The fix. Bring two or three complete packages to the design meeting, each priced in full, and mark the one you would pick and why. Keep the other lines in the showroom for the homeowner who asks to see more.

We added 0% financing to the email that goes to every open lead

Regulation Z's official commentary treats a cost estimate for one homeowner, or a one-to-one follow-up, as outside the definition of an ad, but a financing promotion sent to many leads at once may count as one. A stated payment, term or down payment then needs the down payment, repayment terms and APR beside it, and a deferred-interest offer needs "if paid in full" and the period next to every "no interest". With 34% of 2025 renovators on Houzz paying partly by credit card and 13% using a secured home loan, the subject comes up.

The fix. Keep financing inside the individual proposal, where the lender's terms for that job can be quoted in full. Anything sent to a list uses the lender's approved copy word for word, and makes no claim that financing wins bigger jobs, since no independent study shows it. Have counsel read it before the first send.

Showroom or kitchen table: where the contract is signed changes the rules

Kitchen and bath work is sold in two places: the homeowner’s kitchen and the firm’s showroom or design studio. Federal and state law treat those two places differently, and the difference reaches back into how a firm should advertise and how it should count a sale.

At the kitchen table. The FTC’s Cooling-Off Rule gives a buyer three days to cancel a sale made at home, and it applies even when the homeowner invited the salesperson in to present. The right lasts until midnight of the third business day after the sale, and Saturday counts as a business day. The seller has to explain that right when the sale is made, give the buyer a cancellation form in duplicate, and write the contract in the language the presentation was given in.

In California. The CSLB’s consumer guide gives three business days to cancel a home improvement contract, or five when the buyer is 65 or older. That weighs more in this trade than in most: Houzz counts Baby Boomers, aged 62 to 80 in its study, as 54% of renovating homeowners in 2025. The same guide limits what a contractor may take up front to $1,000 or 10% of the contract price, whichever is smaller, so an ad asking for 10% down on a $55,000 kitchen asks for more than five times what the law allows.

At the showroom. The FTC rule does not reach a sale completed after negotiations at the seller’s permanent place of business, where it regularly sells. California’s three- or five-day right does not apply to a contract negotiated at the contractor’s place of business either.

What that means for the marketing:

  • A “sign tonight” discount at the kitchen table buys a signature, not a job. The buyer can still cancel, and the pressure tends to surface later in reviews.
  • The difference between the two places is not a reason to steer people into the showroom to sign. It is a reason to build a sale nobody wants to undo: a clear design agreement, a written scope and an honest timeline.
  • Deposit and financing offers get checked against California’s limit and against Truth in Lending before they run anywhere.
  • Cancellations are tracked by source. A channel whose contracts unwind within the week is not the channel a report of signatures makes it look like.

Five ways kitchen and bath firms lose the job, or hand a regulator a reason

Calling a consult lead three times, then dropping it
Kitchens average 9.5 months of planning and primary baths 8.4 in Houzz's 2026 study. A homeowner who goes quiet in week two is usually comparing, saving photos or waiting on a budget. Keep a slow, useful follow-up running for months: finished projects, a cost guide, a note before the season they named.
"Kitchens from $199 a month" and nothing else
Under Truth in Lending, an ad that states a payment amount, a number of payments, a down payment or a finance charge must also give the down payment, the repayment terms and the APR, even when the term can only be worked out from the ad. "Financing available" on its own triggers none of that. In California, a 10% down offer on a big kitchen also breaks the home improvement deposit limit of $1,000 or 10% of the price, whichever is smaller.
Older-home remodels advertised without RRP certification
EPA rules bar an uncertified company from advertising covered renovation in housing built before 1978, not only from doing it, and one-person outfits are no exception. The minor-work exemption is six square feet of painted surface per room inside, which a cabinet tear-out passes quickly. Get certified, then say so on the site.
"Licensed, bonded and insured" on a California ad
The CSLB's advertising guide says you may not mention being bonded in advertising or any presentation to the public, that the license number goes on every form of advertising, and that you cannot advertise for work outside what you are licensed for. A B-2 residential remodeling license may only take contracts covering three or more unrelated trades, so a countertop-only special is a job the B-2 cannot contract for alone.
A site that sells kitchens the way any builder would
General contractors are involved in nearly half of kitchen renovations in Houzz's kitchen study, and a generalist's site lists every service on one page. If yours reads the same, the homeowner has no reason to choose a specialist. Show the design process, the rooms you have finished in their town and what your own team handles from drawing to final walkthrough.

The free plan for a firm that sells kitchens and baths

Any kitchen and bath firm that gets in touch receives a free consult and a straight assessment, then keeps the written plan that comes out of it, hired or not. The plan covers:

Get your free plan
  • Where you appear for kitchen remodel and bathroom remodeler searches in your towns, plus a cost search or two, and which firms sit in the map pack and in each Local Services category today.
  • Your galleries, consult request and price ranges, read on a phone the way a homeowner months from a decision reads them.
  • Your reviews beside the two or three firms you lose to most: how many, how recent and whether they carry photos of the finished room.
  • Every ad and page checked for your license number, any "bonded" claim, RRP certification where older homes are involved, and financing terms.
  • What happens to a consult request after it arrives: how fast someone replies and how long the follow-up lasts.
  • The first 90 days in the order we would do them, timed to your build season.

What kitchen and bath owners ask before they hire us

How do you handle homeowners who take most of a year to decide?

With follow-up built for that length. Houzz's 2026 study puts kitchen planning at 9.5 months on average and primary baths at 8.4, so every consult lead goes into a sequence that runs for months: a finished project each month, a cost guide, and a reminder timed to when they said they wanted to build. How we set up the pipeline.

Can you bring us major remodels instead of vanity swaps?

Mostly, by aiming every piece at the bigger job. Houzz's kitchen study puts the median major kitchen remodel at $55,000 and a minor one at $20,000. Pages, search terms and the consult form are built around full remodels, and the form asks for room, budget range and timeline so small jobs sort themselves out before anyone drives to a house.

Should we run Local Services Ads for kitchens, baths or both?

Usually both, if your reviews and response times are strong. They are separate categories: Kitchen remodeling screens the business and owner of every advertiser, Bathroom remodeling only some, and both carry the Google Verified badge. Kitchen and bath remodeling was left out of the first wave of Google's 2026 move into Google Ads. Our Google Ads and Local Services work.

Is Houzz worth paying for?

Only if it signs contracts for you, and we have found no independent figures on what Houzz leads cost or how often they close. The 70 million users Houzz cites are its own number. Track every Houzz inquiry to consult and contract for a full season, then compare cost per signed job with your other sources.

Can we advertise monthly payments on a kitchen?

Yes, with the full terms beside them. Truth in Lending treats a payment amount, a number of payments, a down payment or a finance charge as a trigger that requires the down payment, repayment terms and APR in the same ad. "Financing available" alone triggers nothing. In California, the deposit on a home improvement contract is capped at $1,000 or 10% of the price, whichever is less.

Do we need EPA lead paint certification just to advertise?

For homes built before 1978, yes. The EPA's wording is that firms "cannot advertise or perform" covered renovations in that housing without certification, and it names sole proprietorships as included. Once certified, put it on the site and the profile, where a homeowner with an older house can see it.

Do our Instagram posts need the license number too?

In California and Florida, treat the answer as yes. California's CSLB wants the number on every form of advertising and can fine a first miss $100 to $1,000, and Florida's statute requires it in each advertisement regardless of medium. A boosted post or a paid reel is advertising, so the number goes in the caption or the creative.

How will we know which marketing paid for a kitchen that signs next spring?

Every inquiry is tagged at the source, and the tag stays with it through consult, design agreement, proposal and contract. Each month you see consults booked, proposals sent, contracts signed and cancellations, by source and by room, with the cost of each. With a decision this long, the report that matters most looks back six to twelve months.

Are homeowners asking AI assistants which remodeler to hire?

More every year: 45% of consumers in BrightLocal's 2026 survey had turned to ChatGPT or a similar tool for local recommendations, up from 6% the year before. Those answers lean on what is written about you: reviews that name the room and the town, and pages that explain how a project runs. How we work on AI search.

Remodeling is slowing down. Should we cut marketing?

Cut waste, not presence. Harvard's remodeling indicator, as republished by NARI in July 2026, expects spending growth to slow to 0.5% by mid-2027, and NKBA member firms now expect revenue to fall 2% this year. Trim the channels that do not sign contracts and keep reviews and follow-up running, because the homeowners planning now are next year's jobs.

Have your firm read the way a planning homeowner reads it

Tell us your firm, your towns, whether you have a showroom and how your work splits between kitchens and baths. We send back your positions on the searches homeowners make while they plan, a side-by-side of your galleries and reviews against the firms you lose jobs to, any wording in your ads that a state or federal rule could catch, and the changes we would start with.

  • A free consult. A real conversation about your business, your area and what is not working yet.
  • An honest evaluation. Where you stand in search, ads and follow-up next to the businesses you lose customers to.
  • A plan you keep. What we would fix first and why. It is yours whether or not you work with us.

Form not loading? Email hello@beyaoshy.com and we will reply within one business day.

Sources

The figures on this page come from these published sources, checked on October 3, 2026. Benchmarks are averages across many advertisers; your market will differ, which is what the free plan is for.

Agencies with kitchen and bath remodelers among their clients: see the partner model.